The 75.5 acre site of Seaforth High School in Pittsboro, North Carolina, includes the construction of a two-story building, parking lot and sports fields. The change in impervious area to the site required the need for a 201,000 cubic foot detention basin. Due to limited space, the storm water management system was installed under a P.E. field.
Show Us Your Best
We want to see your best photos. Send us your recent jobsite, weather event, or installation photos and you could be featured in the next issue of SWS. Email your recent images in high resolution (300 dpi) .jpg format to [email protected]. Photos must be taken within one to two weeks of the submission date.