Detention System in Cornelius, North Carolina

Oct. 30, 2019
undefined

The Watermark Luxury Condo development in Cornelius, North Carolina is another example of how early collaboration between the project engineer, developer, and drainage manufacturer can reduce a project’s cost.

Initially designed with a concrete vault for the underground detention system and RCP for the stormdrain pipe, the developer JMR Construction approached the engineering team at Southeast Culvert for a value engineering proposal.

After coordinating with the project engineer Henson Foley, the detention system was redesigned as a perforated 144 inch diameter aluminized type 2 corrugated steel pipe system providing more than 100,000 ft3 of storage.

Most of the stormdrain pipe was changed to spiral rib corrugated steel pipe, which has the same hydraulic capacity as RCP or HDPE pipe (Manning’s n = 0.012). Spiral rib CSP is one of the material options we recommend when allowing multiple drainage pipe material options.

144” diameter CMP is the largest pipe that Southeast Culvert produces. Pipe that large comes with a lot of challenges during production and delivery, but the entire system was delivered on schedule.

The installation of the detention system was documented via drone. The footage and pictures were shared by JMR Construction for use in this article.

Editor's Note: Scranton Gillette Communications and the SGC Water Group are not liable for the accuracy, efficacy and validity of the claims made in this piece. The views expressed in this content do not reflect the position of the editorial teams of Water & Wastes Digest, Water Quality Products and Storm Water Solutions.