This dam in Milbrook, Ontario, pictured with before and after images, was reconstructed to ensure integrity during periods of high flood events. More than 30,000 square feet of Flexamat, a tied concrete block mat system, was installed in less than a couple of weeks as part of an erosion control solution. The material promotes vegetation and provides hard armor protection.
Erosion Control
What's new at EJP
Oct. 16, 2024